PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Excavating at Rahway Ave. for the underground Tele-Data Facing the Administration Building (800x600).jpg Installed manhole by the administration building (800x600).jpg Installing a manhole at Rahway Ave. Facing the new Court Building (800x600).jpg Installing conduit into the manhole Facing the Administration Building (800x600).jpg Pouring concrete at Elev. 1,2,3 (3rd Floor) Facing West (800x600).jpg
Previous page Pouring concrete at Elev. 1,2,3 (3rd Floor) Facing West (800x600)
Pouring concrete at Elev. 1,2,3 (3rd Floor) Facing West (800x600)